R-13, r. 1 - Regulation respecting the water property in the domain of the State

Full text
12. The amount required for the issue of a licence is $74 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $4.41 per linear metre of length of the work concerned on the water property, without being less than $74 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $72 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $4.28 per linear metre of length of the work concerned on the water property, without being less than $72 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $70 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $4.18 per linear metre of length of the work concerned on the water property, without being less than $70 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $69 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $4.14 per linear metre of length of the work concerned on the water property, without being less than $69 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $68 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $4.06 per linear metre of length of the work concerned on the water property, without being less than $68 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $67 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $3.97 per linear metre of length of the work concerned on the water property, without being less than $67 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $66 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $3.91 per linear metre of length of the work concerned on the water property, without being less than $66 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $65 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $3.86 per linear metre of length of the work concerned on the water property, without being less than $65 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $64 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $3.81 per linear metre of length of the work concerned on the water property, without being less than $64 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $63 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $3.75 per linear metre of length of the work concerned on the water property, without being less than $63 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $62 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $3.72 per linear metre of length of the work concerned on the water property, without being less than $62 for each work or structure.
O.C. 81-2003, s. 12.
12. The amount required for the issue of a licence is $61 for each work and structure concerned.
However, for an occupation described in paragraph 4 or 5 of section 10, the amount required is $3.65 per linear metre of length of the work concerned on the water property, without being less than $61 for each work or structure.
O.C. 81-2003, s. 12.